Termites - Post Construction Treatment
Post Construction
Corrective Soil Treatment (CST) – Drilling and pumping of chemicals |
|
- - Holes will be drilled along walls.
- - Termiticide solution will be
injected into each hole according to recommendation.
- - A volume of 4-5 litres of
termiticide solution will be injected into each hole.
- - Injection will be carried out at
21-25 psi pressure for maximum coverage.
- - Each treatment can only last for
2-3years.
|
|
|
Photo of work in progress:

drilling

injecting chemical / according to specification

patching hole

spraying chemical around building